Civil Engineering Technology

Table of Contents

LO1. Understand the methods and techniques used in earthworks activities

The site plan and structural geometry with a suitable scale

The volumes of earthworks for different earthworks

Types of earthmoving equipment

The number of earth moving equipment and time

LO2. Understand methods and techniques used to create substructures

LO3. Understand the methods and techniques used to create superstructures

LO4. Understand the hazards associated with civil engineering activities.

LO5. Be able to solve problems associated with civil engineering activities.

References

LO1. Understand the methods and techniques used in earthworks activities

The site plan and structural geometry with a suitable scale

Pic.1 Site Plan (not scaled)

Pic.1 Site Plan (scaled)

Pic.3 Dimension of the hotel (not scaled)

Pic. 4 Dimensions of the hotel (scaled)

The volumes of earthworks for different earthworks

Under the hotel should be excavated 5m of the ground. And the area that occupies the hotel consists from the sum of 4 shapes.

To calculate the volume of earthwork for the hotel we need to multiply the area by 5m.

Pic.5 Shapes and their dimension inside the hotel

To calculate the earthwork for the green area and parking we have to know dimensions of the whole area and the ground level.

We had to calculate average height in the triangle sections. And also the length of sections was calculated.

Pic.6 The original Cross section of the land; all levels are in meter

The calculation of earthworks for the green area will be approximate. The total volume will be the sum of three sections that are illustrated on the pic.6.

And the total earthwork will be the sum

Types of earthmoving equipment

For this type of work can be used a bulldozer, an excavator, a backhoe loader, a skid steer loader and a trencher.

A bulldozer is a heavy machine with caterpillars and plate for moving huge amount of soil or other such materials.

An excavator is a basic type of machines for excavation. It has a bucket and rotating cab. It can be based on tracks or wheels.

The table below shows which equipment is using with different types of work.

Kinds of work

Equipment

Clearing

Bulldozer, Backhoe

Excavating / Loading

Power shovel (Backhoe, Dragline) Excavator

Excavating / Hauling

Bulldozer, Scrapdozer, Scraper

Loading

Track loader,

Hauling

Dump truck, wagon, conveyer

Spreading / Grading

Bulldozer, wheel dozer, motor grader

Table 1. Kinds of work and equipment

The number of earth moving equipment and time

To reduce the price, a backhoe loaders and a truck can be taken. Considering that productivity of one loader is about , then

Considering that productivity of one loader is about , then

LO2. Understand methods and techniques used to create substructures

A Substructure is an underlying or supporting structure to the superstructure. It is located under the ground level. Substructures include foundation and drainage systems.

The foundation is a support structure, part of a building, a structure that takes all the loads from the overlying …

Download Full Essay Show full preview

Disclaimer

Examples provided by Homework Lab are intended for the motivation and research purposes only. Do not submit any paper as your own piece of work. Every essay example belongs to students, who hold the copyright for the written content. Please, mind that the samples have been submitted to the Turnitin before and may show plagiarism in case of the repeated submission. Homework Lab does not bear any responsibility for the unauthorized submission of the examples.